Home |   |   |   | 
  EXECUTIVE SUMMARY

This report sets out the recommended master plan for the expansion and upgrade of V. C. Bird International Airport. This summary provides a very high level overview of the key findings and recommendations of the study.

The master plan process commenced with a review of the existing facility and the forecasting of future traffic demand. Based upon those two drivers, development options within the pertinent constraints were considered and the preferred master plan layout prepared. This report presents that layout. A financial analysis of the proposed developments to 2030 has been carried out.

Conceptual plans of the proposed new terminal building are presented.

The master plan is essentially a land-use plan that allocates areas of the airfield for certain developments. The plan does not develop all elements in detail, as certain aspects will be subject to aspirations of the market over time. In this respect, the function of the master plan is to ensure that such aspects are appropriately developed without causing unnecessary restrictions to the necessary core expansion of passenger processing and aircraft handling functions.

  MASTER PLANNING PROCESS
   Home |   |   |   |